Length of bridge (4.7km): 63 times the Qutub Minar

Weight of bridge (6.7L tonnes): 50,000 African elephants

424 cables for main roadway: can support 900 tons each

Length of steel wire used (37,680km): Nearly the Earth's Circumference

Concrete used: 2.3 lakh cubic metres

Height of main towers 126 M : 43-storey buidling

Pile caps: Bridge rests on 135 pile caps, the largest being 55 m in length and 55 m in breadth.

Peak-hour sweat: 4,000 workers and 150 engineers